Installation of automatic powered door assist mechanisms,
installation of Deaf Alerter system, K loop installation,
hold open devices wired to corridor doors and linked into
the fire alarm, upgrade existing fire visual fire alarm and
emergency call alarm to toilet areas, refurbishment of four
toilet blocks, strip out existing installation and install
new accessible washroom equipment, together with new
lighting, mechanical ventilation, suspended ceiling, safety
flooring and internal redecoration.
Contract duration: Ten weeks. Budget:
Circa £310,000.00 |
 |