Due to excessive water damage this project comprised of repairs to two bay windows due to severe decay in the timber beams.
Upon further inspection the water had damaged adjacent bay roofs and had caused fractures in the brickwork and damage to stone mullions and transoms.

This project included various refurbishments in the lower medical block.
To supply and fit Ultima PVC ceiling cladding to fifteen shower rooms located in house units 1 to 4. Each ceiling was approximately 15 square meters.
The works briefly comprised of the refurbishment of the segregation block to enhance two cells to a standard suitable for overnight accommodation.
The works comprised of the creation of additional car parking spaces for staff working at HMP Whitemoor to an approximate area of 25 x 20 m adjacent to the Training Dept and RID Unit access road.
This project consisted of creating a DDA toilet and room for a urinal from the existing prisoners toilet on Bravo Unit 2 and to create and extra toilet in the OMU office.